Center West Phase 1A – Mixed-Use Retail/Residential Development, Baltimore, MD

Center WestCenter West is a mixed-use Retail/Residential project in the Poppleton neighborhood of West Baltimore. The site is part of a Planned Unit Development approved by the Mayor and City Council in April of 2007.

Completion Date:  Projected 2016

Construction Cost:  $61,000,000

Owner:  La Cite LLC

Architects:  Gensler & JDavis Architects

The first phase, Phase IA, is comprised of two buildings located on Blocks E|F and Block H as well as a surface parking lot at Block G. The total square footage of Blocks E|F and H is approximately 485,500 sf with 257 Residential Units and 19,300 sf of Retail. There are approximately 310 parking spaces across all three blocks.

CCJM was the MEPFP Engineering Consultant to the architectural design team of Gensler and J Davis Architects. CCJM worked in close coordination with the architectural team as well as the civil/structural consultant and others to develop efficient MEPFP systems that met the client’s design direction and was coordinated with the architectural design through BIM modeling using Revit 2014 MEP.Center West 2