Skip to content
DC Water treatment project

Water/Wastewater

DC Water Infrastructure Project

Under a four-year contract (2005 through 2008, and extended to 2013), numerous Agreement Task Orders saw the CCJM/PHR+A Joint Venture responsible for the design of repair, replacement, upgrade and extension of water distribution, wastewater collection systems, and miscellaneous facility upgrades for DC Water. CCJM was specifically accountable for Geotechnical Investigations and Thrust Restraints, Anacostia First High South Water Main Replacements. At the Blue Plain’s Wastewater treatment plant location, CCJM provided Entrance Improvements, design of Line stops, Large Valve Replacements, and 16-inch Diameter Water Main Replacements.

Project G201 Rehabilitation of Structures, Constitution Avenue Area and Spring Place Water Main Replacement, and Sewer Rehabilitation.

Engineering services included the Service Life Restoration Program and Rehabilitation of Structures. Stormwater Pollution Prevention Plan Preparation and more.

DC Water treatment project
DC Water treatment project
CCJM

Install C.C. Johnson & Malhotra, P.C.

Install this application on your home screen for quick and easy access when you’re on the go.

Just tap then “Add to Home Screen”