CCJM provided MEPFP Schematic Design Documents to allow the EOR to fully understand the main design concepts, orientation, and criteria. CCJM’s services included (but not limited to) HVAC design criteria, special systems that require 24/7 operation, power requirements, and fire protection and fire suppression systems for the New Malcolm X College Campus, including a 500,000 sq. ft campus building and 2,000-car parking structure. The site is two city blocks and includes the Academic Building at approximately 500,000 gross square feet. The Academic Building includes Classroom Space, Teaching Labs, Computer Labs, General Administration Spaces, Common Space, and Simulation Labs. The Common Areas include an NCAA Gymnasium, Natatorium with 25m pool, 250 seat Theater, Fitness Center and Locker Rooms, Library, Bookstore, and Food Court/Cafeteria.
The New Malcolm x College Campus boosts the colleges’ science programs – the new School of Health Sciences includes a teaching hospital and mortuary intended to simulate real-world conditions for students hoping to graduate with employable skills.
Project Cost: $251,000,000